CSI/ProLogis – Anaheim

CSI/ProLogis awarded a major contract to Clarion to Design and Build their new 132,000 s.f. freezer distribution center which included 14,000 s.f. of corporate offices in Anaheim, California.
CSI/ProLogis awarded a major contract to Clarion to Design and Build their new 132,000 s.f. freezer distribution center which included 14,000 s.f. of corporate offices in Anaheim, California.
Clarion demolished the existing 100,000 s.f. warehouse to clear the site.  The new structural iron frame supports the steel joist and metal deck roof system, as well as two refrigeration penthouses.
Clarion demolished the existing 100,000 s.f. warehouse to clear the site. The new structural iron frame supports the steel joist and metal deck roof system, as well as two refrigeration penthouses.
Using Metl-Span panels, Dow underfloor and over deck insulation, HCR Doors and a 1200 horse power ammonia refrigeration system, the new 38 clear building will be a West Coast flagship for the company.
Using “Metl-Span” panels, “Dow” underfloor and over deck insulation, “HCR Doors” and a 1200 horse power ammonia refrigeration system, the new 38 clear building will be a West Coast flagship for the company.
One of the challenges of this project was maintaining the operation of the existing 100,000 s.f. freezer facility location at the rear portion of the site.
One of the challenges of this project was maintaining the operation of the existing 100,000 s.f. freezer facility location at the rear portion of the site.
Another challenge was the retrofit of the existing facility with a code compliant, modern refrigeration plant in the new machine room which is being constructed to run both the old and new facilities.
Another challenge was the retrofit of the existing facility with a code compliant, modern refrigeration plant in the new machine room which is being constructed to run both the old and new facilities.
With the design and installation expertise of C & L Refrigeration, Anaheim, California the project has been a success.
With the design and installation expertise of C & L Refrigeration, Anaheim, California the project has been a success.
Clarion Construction CSI/Prologis project.
Clarion Construction CSI/Prologis project.
Due to complete on 5/22/01 CSI/ProLogis will add 13,733 pallet positions to overall capacity to better serve their Southern California customers
Due to complete on 5/22/01 CSI/ProLogis will add 13,733 pallet positions to overall capacity to better serve their Southern California customers
The completed building is a State of the Art facility encompassing both the warehouse and the corporate offices.
The completed building is a “State of the Art” facility encompassing both the warehouse and the corporate offices.
New Battery Room with overhead battery hoist.
New Battery Room with overhead battery hoist.
New multi-level freezer, racking system in place and completely full.
New multi-level freezer, racking system in place and completely full.
New Staging Dock with all white, sanitary finishes and HCR Doors.
New Staging Dock with all white, sanitary finishes and HCR Doors.
Exterior view of the Loading Dock in full operation.
Exterior view of the Loading Dock in full operation.
Aerial view of the completed CSI/Pro Logis Freezer Distribution Center in Anaheim, California.
Aerial view of the completed CSI/Pro Logis Freezer Distribution Center in Anaheim, California.