Ralphs Grocery | Clarion Construction

Kelly’s Favorites

Santa Monica Seafood


 

Ralphs Grocery Company needed a distribution center to service their Northern California stores as a result of the Ralphs/Food 4 Less merger. Tom Gast of Ralphs called upon CB Richard Ellis for assistance in locating a 600,000 s.f. 38′ high clear building. Through his broad base of listings, David Norrie of CB Richard Ellis found a perfect fit with two 315,00 s.f. opposing buildings in Stockton, California.

With no time to lose, Ralphs negotiated a design build contract with Clarion to retrofit one of the buildings with 100,000 s.f. of -10 F Freezer and 215,000 s.f. of various temperature coolers. Clarion also constructed a new 5,000 s.f. multi-story Machine Room, a 13,000 s.f. Connecting Dock-Battery Charging Room, and 12,000 s.f. of Welfare areas and offices.

The contract was awarded in August, 1999 with permits received in September and full occupancy by March 31, 2000. During the final walk through, Tom Gast of Ralphs commented, “I really appreciate the attention to detail and quality of workmanship Clarion provided to the project, they did a great job.”

This project features “Dow” HI-40 under floor insulation, “Metl-Span” wall and ceiling panels, Rytec Doors, and an 1875 HP ammonia refrigeration plant.

Clarion is pleased to have worked with Ralphs/Fred Meyers project manager, Mr. Jim Venters on this prestigious project.