Turn Key General Contractor

Gold Star Foods

Dixon, CA

Gold Star Foods contracted Clarion for an expansion just north of Sacramento. Partnering with

Subzero and Mycom Refrigeration, we created a state of the art, central Freon engine room to temperature control the 54,000 sq. ft. freezer, 17,000 sq. ft. cooler, and 24,000 sq. ft. cool dock. Clarion used all Rytec high speed doors, and Jamison man doors to combine safety and reliability.


All Metl-Span wall and ceiling panels combined with new LED lighting, made for a bright white working area for the employees. The freezer floor used Title 24 required 7 inch thick Dow Freezermate and vapor barrier. To create a reliable heat source, Clarion used Onyx hosing and Watts Radiant self-contained glycol warming panel.


Overall, Gold Star got a workhorse industrial cold storage facility and 7,000 sq. ft. tenant improvement area. Equipped with new offices, warehouse, restrooms, and locker rooms. A great project with a great industry partner.

Project Features:

  • 54,000 sq. ft. freezer, 17,000 sq. ft. cooler, and 24,000 sq. ft. cold dock
  • Rytec High Speed doors
  • Jamison man doors
  • Metl-Span wall and ceiling (IMP Panels)
  • Mycom Powered Freon Engine Room
  • Dow Freezermate underfloor insulation
  • 7,000 sq. ft. T.I. offices, restrooms, and locker rooms
Share by: