Image Description

Wawona Packaging Company

Recently, Wawona Packing Company selected Clarion Construction, Inc., to construct their new 175,000 s.f. packing facility in Cutler, California.

The south packing area grading, base, and rebar in place.
The south packing area grading, base, and rebar in place.
Detail of south packing area drains, base and rebar in place.
Detail of south packing area drains, base and rebar in place.
Photos of the structural steel being placed.
Photos of the structural steel being placed.
At the east side of the facility, approximately 30,000 s.f. of covered loading area is provided to stage incoming fruit.
At the east side of the facility, approximately 30,000 s.f. of covered loading area is provided to stage incoming fruit.
150,000 s.f. of conditioned space maintains a comfortable environment for both the produce and the employees.
150,000 s.f. of conditioned space maintains a comfortable environment for both the produce and the employees.
The new employee lunch room is spacious and functional.
The new employee lunch room is spacious and functional.
The testing kitchen is impressive.
The testing kitchen is impressive.
The exterior is typical of Mr. Smittcamp’s facilities, fully landscaped and architecturally in a class by itself.
The exterior is typical of Mr. Smittcamp’s facilities, fully landscaped and architecturally in a class by itself.
A 60 year tradition of consistent quality.
A 60 year tradition of consistent quality.