Clarion converted an existing ambient tilt building into a temperature controlled beer distribution center. Clarion consumed 120,000 sq. ft. for the conditioned warehouse and 14,000 sq. ft. of box in box keg storage. Clarion partnered with Hill Phoenix, Heat Craft/Bohn Refrigeration to install rooftop mounted Freon equipment paired with an Einstein Central Controller. Clarion installed the Metl-span panels and Jamison man doors with Albany high-speed roll-up doors for fast-paced operation. The project included a 2000-amp service upgrade and new LED lighting for Title 24 compliance. The project was completed on time in an operating facility. The coordination challenges were worth the end project and resulted in a very satisfied client.